MEP BIM Modeling with LOD 400 for Residential Building, USA

MEP Modeling Case Studies
MEP BIM Modeling with LOD 400 for Residential Building, USA

Project Overview

Client Profile
Architectural Engineering Firm
Location
USA
Industry
Residential Building Construction
Inputs
PDF files with markup drawing
Deliverables
MEP 3D Model and Construction Drawings using Revit
AutoCAD Revit Logo

Challenges

  • Inculcate changes in drawings as provided by the client to achieve higher LOD of MEP models.
  • Enable hassle-free and swift fabrication and erection of the MEP structure at site.
  • Complete synchronization of mechanical, plumbing and electrical disciplinary clashes in model.

Our Solutions and Approach

Developed MEP 3D model with LOD 400 and extracted construction drawings using Revit.

Share Your Thoughts

The architectural firm involved in development of a residential building in the USA, approached Hitech to develop an MEP BIM 3D model with LOD 400 standards as per AIA. Our teams worked on the project for two months to deliver a final Revit MEP model to benefit the client.

  • Work started by client sharing primary drawings in PDFs and red-markup drawings.
  • Initially all the drawings were imported to Revit MEP to create a BIM 3D model for scrutiny.
  • BIM models were prepared and clashes were eliminated between architectural, structural and MEP disciplines.
  • Final MEP BIM model with higher level of detailing and construction drawings was shared with the client.

Because of the partnership the client could benefit in hassle-free and seamless fabrication and installation of MEP components on shop floor and on site respectively. Also, reworks were avoided which helped the client save costs and time by a huge amount.