Challenges
Business Needs
BIM consultants in Europe, working on plant room equipment coordination needed to develop a 3D BIM model of the arrangement to gain insights on the spatial coordination alternatives.
Generated coordinated 3D MEP model in Revit with clash free plant room layout.
Our MEP engineering teams collaborated with the MEP design engineers at the client’s end to create a clash free 3D model in Revit.
With an efficiently designed 3D model, the client could easily detect clashes and resolve them with informed decision making as well as cost saving. Multiple quality checks resulted in error free 3D modeling and first time right deliverables.